Oilfield Drilling Fluids Solid Separator Cleaner Control Equipment Mud Desilter
Product Description :
As a solids control equipment of the third stage in drilling operation, desilter is used to remove solid particles of 20-40 µm in drilling liquid. The desilter of this type that has been reformed many times on the applications for years is reliable in technical performance and provides very good treatment results. Its water cyclone is of long service life and stable performance. It is applicable to various kinds of drills in the oilfields.
The inlet and outlet of water cyclone can be connected very quickly, which is convenient for replacement and maintenance.
Spec
Model |
ZCCN/100x4 |
ZCCN/100x8 |
ZCCN/100x12 |
ZCCN/100x16 |
Hydrocyclone:mm |
DN100 |
DN100 |
DN100 |
DN100 |
Cyclone Quantity |
4 |
8 |
12 |
16 |
Working pressure :MPa |
0.2-0.45 |
separation
article Size: um |
15-47 |
Treating Capacity :m³/h |
≤60 |
≤120 |
≤180 |
≤240 |
Screen Area:mm |
1480x600 |
Inlet diameter:mm |
DN100 |
DN150 |
DN200 |
DN200 |
Outlet diameter:mm |
DN125 |
DN150 |
DN200 |
DN200 |
Matching Motor :KW |
45 |
45/55 |
45/55 |
55/75 |
Weight:KG |
600 |
700 |
1250 |
1950 |
Overall Dimension:mm |
1500x1150x2000 |
1500x1150x2000 |
1800x1600x2400 |
2800x1780x2400 |
Product Pic
Features and Benefits:
Pure polyurethane or high-chromium iron made cyclone.
Clamp connection for the installation of cyclone, easy to be dismantled and replaced.
Optional ball valve can be installed at the inlet and outlet of cyclones; it is available to choose the cyclone's quantity.
Adoted international brand vibration motor, Martin or OLI motor.
Why choose us?
Q1. Are you a manufacturer?
Yes, we have manufactured oilfield equipment for over 20 years. We can produce product according the spec customer provided .
Q2. Do your equipment come with a warranty?
Yes, we have one year warranty. and we provide very patient after service job .
Q3. Can we customize the equipment from you?
Yes, actually 60% of our products are customized for our clients. You just need to let us know your demand (specifications &drawing is better), and we shall realize them for you.
Q4. How do you deliver your equipment?
By sea usually
Q5. What's the lead time for the equipment and its spare parts?
Generally 20 days for manufacturing of complete set of equipment. Depending on the quantity, the lead time for spare parts is between 15 days.