Oilfield Drilling Solids Control Equipment Jet Mud Mixing Mixer
Product Description
Jet mud mixer matched with well drilling solids control equipments, mainly used inweighting drilling mud, changing the density, viscosity, water lose, etc. if it is usedwith shearing pump together, the effect will be more excellent, it can be designeddouble jet mud mixer according to customers' requirements.
Spec
Model |
ZCHHQ/P150x150-50 |
ZCHHQ/P150x150-40 |
ZCHHQ/P150x150-30 |
Matching Pump |
SB8*6-13 |
SB6*5-13 |
SB5*4-13 |
Power |
55Kw |
45Kw |
37Kw |
Capacity |
240m³/h |
180m³/h |
120m³/h |
Pressure |
0.25~0.40Mpa |
0.25~0.40Mpa |
0.25~0.40Mpa |
Inlet :mm |
150mm |
150mm |
150mm |
Nozzle Caliber |
50mm |
40mm |
35mm |
Hopper Diameter |
750*750mm |
750*750mm |
7600*600mm |
Burden Speed |
≤100kg/min |
≤80kg/min |
≤60kg/min |
Density |
≤2.8g/cm³ |
≤2.4g/cm³ |
≤2.0g/cm³ |
Viscosity |
≤120s |
≤120s |
≤80s |
Detailed Pic
Why choose us ?
Q1. Are you a manufacturer?
Yes, we have manufactured oilfield equipment for over 20 years. We can produce product according the spec customer provided .
Q2. Do your equipment come with a warranty?
Yes, we have one year warranty. and we provide very patient after service job .
Q3. Can we customize the equipment from you?
Yes, actually 60% of our products are customized for our clients. You just need to let us know your demand (specifications &drawing is better), and we shall realize them for you.
Q4. How do you deliver your equipment?
By sea usually
Q5. What's the lead time for the equipment and its spare parts?
Generally 20 days for manufacturing of complete set of equipment. Depending on the quantity, the lead time for spare parts is between 15 days.
If you are interested, feel free to inquire us.
We are looking forward to cooperating with you.